Home Products Contact About Me Delivery Schedule Board Drag-and-drop scheduling for Acumatica Sales Orders onto carrier timelines. Built on the Flexible Scheduling engine — additional use-cases available. Starting at$1,199.00/yr Detail-aware Side Panels Unlease the full potential of side panels by unlocking the ability to use fields from detail grids as parameters. When a line is selected, the field value is passed to the side panel in real-time. Starting at$999.00/yr Plot Generic Inquiry Addresses Geocode and plot address markers from any Generic Inquiry onto interactive maps. Compatible with Google and Azure Maps. Starting at$1,199.00/yr Generic Inquiry Filter Tabs Shows saved generic inquiry filters as tabs in the grid’s filter row, replacing the dropdown, on every generic inquiry. Starting at$499.00/yr Email Protected Pay Stubs Securely distribute employee pay stubs as password-protected PDFs with granular per-employee configuration and batch processing. Starting at$999.00/yr Email Record’s Files with Business Event Send real file attachments from the triggering record through Acumatica Business Events. Starting at$299.00/yr Click-to-call Soft Phone Dialer Initiate calls directly from Acumatica with a single click. Works with any soft phone application that supports the TEL protocol. Starting at$299.00/yr Flexible Popup Notes Get popup notes on any screen or from another screen. Starting at$799.00/yr